Who owns Clear Creek wind farm (Tenaska Energy)
One company in the researched set discloses a stake in Clear Creek wind farm (Tenaska Energy), worth $0 between them. Clear Creek wind farm (Tenaska Energy) is private, so no 13F reports it: a 13F covers exchange listed positions only. These figures exist because each holder disclosed the stake in its own filings.
Clear Creek wind farm (Tenaska Energy) - Profile
- Type
- joint venture
- Based in
- United States
- Founded
- 2020
Clear Creek is a 242 MW onshore wind farm in Nodaway County in northwest Missouri, built in two phases of roughly 22 MW and 220 MW and developed by Tenaska Energy, which holds and runs it through the project company Tenaska Clear Creek Wind, LLC. The project reached commercial operation in May 2020 and sells its output under a long term power purchase agreement rather than into the merchant market, with plant operations contracted to NAES. Its connection to the regional transmission system produced a long running dispute over who should pay for the network upgrades required to interconnect it: Tenaska Clear Creek Wind challenged the proposed cost allocation at the Federal Energy Regulatory Commission in May 2021, and the complaint was denied in September 2022.
Source
Clear Creek wind farm (Tenaska Energy) files nothing with the SEC, so none of this comes from a filer record. The description was written for this site in August 2026 from Pinnacle West Capital Corporation and Arizona Public Service Company Form 10-K for the year ended 31 December 2022 (SEC) and Clear Creek wind farm (Global Energy Monitor). The ownership figures below come from the holders' filings instead, and are sourced row by row.
The disclosed stakes
One row per position. Where a holder reports the same company in two share classes, both rows are shown rather than summed, because the class is part of a position's identity.
Where each figure comes from
A private stake has no ownership form behind it, so the source is always the holder's own filing or disclosure. Anything modelled says so, with the arithmetic.
- Pinnacle West Capital Corporation, as of 30 Jun 2026. The 10-Q states PNW Power's equity-method investment in Clear Creek was fully impaired in Q4 2022, so the carrying value is $0 even though the 9.9% ownership interest is unchanged. This is an equity-method stake in the project company, not an undivided physical interest in a plant like Palo Verde. source
What this page is not
It is not a complete register. It lists the holders who happen to be inside the researched set and disclosed the stake themselves. A private company can have many other shareholders, and nothing here rules them out: venture investors, founders and employees usually appear in no public filing at all. Percentages are of Clear Creek wind farm (Tenaska Energy) where a holder stated one, and are missing where no holder did.